• 2018 - 2020 PJSC Unipro, Beryozovskaya GRES Power Plant, Krasnoyarsk Territory

     

    Maintenance and repair works, Energy Unit 3, boiler house

     

    TASKS

     

    • Preparation of design documentation (fireproofing project):

      - feasibility evaluation of adopted design decisions on fireproofing methods and means;

      - calculations of strength and thermal performance;

      - estimation of required materials;

      - design of complex units;

      - graphic detailed design of elements of the building frame.

    • Performance of a set of works to replace the fireproof coating:

      - abrasive blast cleaning of metal structures;

      - application of anticorrosion and fireproof coating to metal structures of the boiler house at Energy Unit No. 3 of the Beryozovskaya GRES Power Plant.

     

    The fireproofing project was approved by the State Fire and Rescue Academy of the Ministry of Emergency Situations of Russia, Federal State Budgetary Organization All-Russian Research Institute for Fire Protection of the Ministry of Emergency Situations of Russia, and successfully delivered to the Customer.

over 200,000 sq m Total area of completed works

FEATURES

  • Five-level quality control of delivered works;
  • The works were carried out 24/7 simultaneously with the assembly of the boiler and auxiliary equipment, electric installation and thermal insulation works, which implied a high level of simultaneous operation;
  • The main unit that is 120 meters high is a technically complex facility that requires a special approach to the delivery of works;
  • Industrial climbers carried out most of the works.