2018 - 2021 Norilsk-Taimyr Energy Company Norilsk Thermal Power Plant Station No. 2, Krasnoyarsk Territory
Set of construction works as part of reconstruction
TASKS
- Works were carried out to deinstall and install wall railings of the Norilsk Thermal Power Station No. 2, main building in axes A/1-10, D/3-10, 1/A-B-V, 3/V-G-D according to the project "Thermal Power Station No. 2.
- Reconstruction (Replacement) of Equipment in the Energy Units of Station 1 and Station 2";
- Delivery of works regarding application of anticorrosion and fireproofing coating to metal structures in the main facility.
FEATURES
- Difficult logistics in conditions of the Russian Far North;
- The equipment was reconstructed without any suspension of the Thermal Power Station operation;
- Simultaneous operation with other contractors;
- Exposure to severe conditions during the application of protective coating to surfaces;
- Industrial climbers carried out most of the works.