2023 - 2025
TASKS
- Fire protection of the building's load-bearing metal structures.
- AKZ of auxiliary metal structures
FEATURES
- Carrying out work on the complete removal of existing coatings by abrasive blasting in conditions of a high degree of readiness of the facility for commissioning - all main and auxiliary equipment, electrical and engineering networks have been installed
- Turnkey contract with design, author supervision, supply of all materials - Regulatory and technical control by the independent state fire testing laboratory of the EMERCOM of Russia with fire tests of the supplied materials and constant quality control of the work performed at the facility
- Regulatory and technical control by the independent state fire testing laboratory of the EMERCOM of Russia with fire tests of the supplied materials and constant quality control of the work performed at the facility
- Combining work with installation companies